Completed in July of 2017, Pascal Steel was hired as a sub-contractor to install a Varco Pruden manufactured pre-engineered metal roof (standing seam) and insulated wall panels for this 200,000 sq ft. cardboard manufacturing facility in Ontario, CA.
Watch a Time-Lapse of Progress Pascal Steel was hired to erect this 174,000 sq ft. metal building for TEC Equipment in Fontana, CA. TEC’s new facility will actually be the largest Dealership for Mack Trucks and Volvo in North America, featuring 80...
This project was a solar farm at St. Mary’s Hospital located in Apple Valley, CA. Pascal Steel supplied and erected “T” shaped canopies with purlins for photovoltaic panels.
This solar carport located in Riverside, California was constructed by Pascal Steel in 2010. At the time, carport structures were a niche market in the solar industry for government and municipal parking lots, with little expected growth. Relatively speaking, this was...
This structure is a three story Dive platform designed over water for military personnel to train on. This is located on the Marine Military base in San Diego county. The material consisted of galvanized structural steel and B-deck.
At the VA Hospital in Menlo Park, Pascal Steel was involved in a design build project consisting of two conventional steel structures. Pascal’s portion of this project was installing vertical seam standing seam roof, FW-12 soffit panel and Hunter Douglas composite...